New FLORIM industrial building under construction The new prefabricated industrial building, which will extend from the current ceramic site of the FLORIM industrial group up to the Pedemontana motorway, is under construction. The building will be used to cut and process large-sized slabs, up to 160x320cm in three different thicknesses of 6/12/20mm. The new plant will have an area of about 48.000 square metres, and is an example of a 4.0 factory for the high technological level with which it has been designed. In collaboration with other professional firms that has taken care of the plant design, Ingegneri Riuniti has supervised the architectural and structural executive design, as well as the acquisition of the relevant authorizations through BIM (Revit) procedures.