This project concerns the demolition of school buildings that are part of the G. Galilei complex, located in Mirandola (via J. Barozzi, 4). This intervention was part of the restoration of full operational capability of the school campus, made unavailable due to damage suffered as a result of the seismic events of May 20 and 29, 2012. In order to begin the process of reconstruction and restructuring, it was therefore necessary to proceed with the complete demolition of two buildings. Being it a highly urbanized environment, the intervention was programmed aiming at ensuring maximum organization and timely execution of all phases of work, in compliance with the regulations on safety and mitigation of the discomfort caused to the neighborhood.

Project Synthesis

Year: 2012-2013

Place: Mirandola (MO)

Customer: Provincia di Modena